LV Distribution & Control

MCC Panel (Motor Control Centre)

Bring motor feeders, starting methods and control requirements together in one MCC proposal.

Send drawings, a schedule or a short brief. We review the scope, identify open technical questions and discuss drawing and quotation requirements.

Discuss your project

Drawings incomplete? Tell us what you know. Attachments are optional.

GCK Low voltage withdrawable switchgear

GCK cabinet platform shown as a catalogue configuration reference. The project arrangement, components and ratings are confirmed in the approved proposal.

Rated frequency50 Hz
Rated operating voltage380 / 660 V AC
Rated insulation voltage660 V
Horizontal busbar current630–3150 A
Vertical busbar current600 A
Horizontal busbar short-time withstand80 kA RMS, 1 s

Source: product catalogue, page 34. Ratings belong to the stated model and functional unit. Other voltages, frequencies and environmental conditions require confirmation.

View the complete model parameters
Vertical busbar short-time withstand50 kA RMS, 1 s
Horizontal busbar peak withstand176 kA
Vertical busbar peak withstand110 kA
Main circuit connector current options200 / 400 A
Auxiliary circuit connector current10 A
Power-frequency test voltage, 1 min2500 V
Enclosure protectionIP40
Operating modesLocal / remote / automatic
Installation altitude≤2000 m
Supplier network

Selected component brands we can source

Send your approved makes and models. We work through suppliers to confirm suitable components for the project scope.

Schneider Electric
ABB
CHINT
Siemens
DELIXI Electric
Mitsubishi Electric

Models, supply routes and availability are confirmed per project. Component sourcing does not imply system certification or brand authorization.

Project documentation

Documents you can request

Request the records applicable to the proposed equipment and the company responsible for production.

Quality management illustration

ISO 9001

Quality management system

Confirm the certificate holder and validity.
Technical document illustration

Type-test report

IEC 61439

Confirm the actual report and applicable product scope.
Inspection record illustration

Inspection records

Checks for the delivered equipment

Required records are agreed with the order.
People, supply and support

Why work with Zejiefu?

Practical sourcing, experienced people and technical support after shipment.

Low-voltage switchgear assemblies in a workshop
Low-voltage assembly reference
01 · Yueqing supply base

More options within your budget

Based in Yueqing's established electrical manufacturing cluster, we draw on a mature cabinet and component supply network to develop a cost-conscious proposal.

02 · 28 years of team experience

Make the design buildable

Our engineering and installation teams review drawings with attention to practical assembly, access and installation.

03 · After delivery

Technical help stays available

We support questions about installation, documents, troubleshooting and replacement parts after shipment.

What happens after you send the brief?

We identify missing decisions early so you can compare the proposed scope and quotation.

You send

  • Motor schedule and SLD
  • Starting methods and duty
  • Control and interlocking requirements
  • Installation space and cable entry

We check

  • Incoming and outgoing scope
  • Ratings and selection inputs
  • Layout and access constraints
  • Spare provision and open questions

We discuss next

  • Possible equipment arrangement
  • Items needing confirmation
  • Drawing and document scope
  • Quotation scope and exclusions

Initial project discussion is free. Preliminary scheme and drawing scope are discussed case by case; final construction drawings are agreed separately.

Configuration and project guidance

Review the product scope and selection notes before sending your requirements.

Product overview

An MCC coordinates motor feeders, protection, starting methods and control interfaces in one assembly. The design should follow the project motor list, control philosophy, process interlocks and available fault level. Zejiefu reviews these inputs before proposing the feeder-unit arrangement, control wiring and cabinet construction.

Configurable engineering scope
  • Direct-on-line, star-delta, soft-starter or VFD feeder coordination
  • Fixed or withdrawable units subject to the approved design
  • Motor protection, metering, indication and local control
  • PLC, remote I/O and communication provisions where specified
  • Control terminal, cable-entry and interlocking requirements
Typical applications
  • Pumps, fans, conveyors and process equipment
  • Water treatment and utility systems
  • Manufacturing lines and industrial auxiliaries
  • HVAC and building-services motor groups
Information required for quotation
  • Motor schedule with power and starting method
  • Control voltage and control philosophy
  • System fault level and feeder quantities
  • Communication and remote-control requirements
  • Preferred component make and spare feeders
Standards, drawings and inspection

The applicable IEC standard, routine inspection scope, drawing format and project documentation must be confirmed against the technical specification. Ratings and compliance statements are not assumed before engineering review. Approved general-arrangement drawings and component schedules form the basis for production.

Application solutions and RFQ guidance

Industrial motor-control applications

Before requesting a configuration, review the SLD and BOQ preparation guide.

Coordinate the APFC capacitor bank data

Where reactive-power compensation is included in the package, provide the existing and target power factor, load profile, required kVAr and harmonic information. Review the APFC capacitor-bank selection inputs before issuing the RFQ.

MCC feeder information to include in the RFQ
Input Details required
Motor schedule Motor reference, quantity, kW rating, full-load current and duty
Starting method Direct-on-line, star-delta, soft starter, VFD or project-specific arrangement
Control Control voltage, local/remote selection, start/stop logic and emergency conditions
Interlocks Process permissives, trips, external contacts and sequence requirements
Communication Protocol, remote I/O, status points and interface responsibility
Construction Fixed or withdrawable units, cable entry, spare feeders and IP rating
Coordinate the MCC with the distribution package

The MCC should be coordinated with upstream protection, standby transfer requirements and reactive-power compensation. Review the ATS panel and APFC capacitor bank panel where they form part of the same package.

For procurement documents, use the SLD and BOQ RFQ guide and the IEC 61439 procurement checklist.

MCC selection for hot and dusty sites

For projects with high ambient temperature, dust or cooling-contingency requirements, read our MCC panel selection guide for hot and dusty sites before preparing the motor schedule and RFQ.

Separate VFD control panel or MCC?

For a standalone variable-speed motor-control cabinet, review the VFD control panel. Keep grouped motor feeders and the overall control philosophy in the MCC enquiry when one coordinated assembly is required.

Common questions

What is the most important document for an MCC quotation?

A motor list or feeder schedule is essential. It should identify motor ratings, starting methods, control requirements and quantities.

What information is required for a VFD feeder?

Identify the motor data, VFD rating or selection basis, bypass requirement, control method, communications, cable conditions and any harmonic or EMC requirements stated by the project.

Can fixed and withdrawable feeders be included in one MCC package?

The construction can be reviewed against the approved specification and maintenance philosophy. The final arrangement must be confirmed on the general-arrangement and feeder drawings.

Is the catalogue model the final project specification?

No. The illustrated cabinet platform is a reference. The supply system, selected components and approved technical proposal determine the final equipment ratings and construction.

Send your project requirements

Start with what you have. We will identify the next technical questions.

Discuss your project