POWER DISTRIBUTION SYSTEMS

Quality & Standards


Define the evidence your project requires

Applicable standards, inspection activities and report availability must be confirmed for the specific equipment and order. The checklist below is for agreeing requirements; it is not a claim that every listed test or certificate is included.

Review area What to agree
Drawings and components Approved drawing revision, circuit schedule, component makes and proposed deviations.
Assembly inspection Required dimensional, visual, identification, wiring and connection checks, with the records to be supplied.
Electrical and functional tests Applicable methods, acceptance criteria, test equipment and report format. Confirm insulation, dielectric, operation or interlock tests only where relevant.
FAT or witness requirements Whether witnessing is required, the proposed procedure, notice period and the records to be reviewed.
Packing and documentation Document list, labels, packing requirements and release conditions agreed for the order.

Standards are not the same as certificates

A standard referenced in a specification is not a certificate or an approval. Request the relevant document, issuing body, product scope and validity where certification is required. Evidence for an individual component should not be treated as evidence for the complete assembly.

No blanket certification or test-report availability is asserted on this page. Send your required standard and evidence list so availability and scope can be confirmed in the proposal.