Equipment configuration and production coordination
Define your electrical distribution equipment requirements through drawings, component schedules and installation conditions. The photographs below show equipment arrangements for reference; the proposed configuration is confirmed for each order.


Agree the production scope before ordering
A useful enquiry identifies the equipment, quantities, installation conditions and available drawings. The proposal should distinguish the agreed supply scope from items that still need technical clarification.
- Share the SLD, BOQ or equipment schedule and destination.
- Clarify cabinet configuration, component preferences and interfaces.
- Agree the required drawings, inspection evidence and delivery documents.
- Confirm the proposed scope and any deviations before order approval.
Ask about the factory scope for your order
Request confirmation of the responsible factory and which processes are performed in-house or subcontracted, including enclosure fabrication, busbar work, assembly, wiring, testing and packing. A photograph does not establish a specific machine capacity, production area or certification.
LV switchgear · Distribution boards · Inspection and document requirements