LV Switchgear

Automatic Transfer Switch Panel

Automatic transfer switch panels for controlled transfer between normal, standby or generator power sources.

Quick answer

What it is: Automatic transfer switch panels for controlled transfer between normal, standby or generator power sources.

How it is specified: Final ratings, feeder arrangement, enclosure and components are confirmed from the SLD, BOQ and approved technical specification.

Standard
Applicable IEC standard to be confirmed against the project specification

Final ratings and construction are subject to approved project drawings.

Technical content reviewed by Zejiefu Engineering Team. Updated 3 8 月, 2026. About Zejiefu.

Product overview

An ATS panel monitors available power sources and transfers the connected load according to an approved operating sequence. The correct design depends on the number of sources, switching arrangement, neutral treatment, generator signals, transfer timing and critical-load requirements. Zejiefu develops the panel around the submitted sequence of operation and single-line diagram.

Configurable engineering scope

  • Two-source or project-specific transfer arrangement
  • ATS device or interlocked breaker configuration
  • Automatic, manual and test operating modes
  • Voltage monitoring, time delays and generator start signals
  • Mechanical and electrical interlocking with status indication

Typical applications

  • Emergency and standby power distribution
  • Commercial buildings and public facilities
  • Industrial critical loads and utility systems
  • Data and communications rooms under the approved design

Information required for quotation

  • Normal and standby source ratings
  • Load current and short-circuit level
  • Three-pole or four-pole switching requirement
  • Transfer sequence and timing requirements
  • Generator interface and remote monitoring points

Standards, drawings and inspection

The applicable IEC standard, routine inspection scope, drawing format and project documentation must be confirmed against the technical specification. Ratings and compliance statements are not assumed before engineering review. Approved general-arrangement drawings and component schedules form the basis for production.

Frequently asked question

Can an ATS panel use a project-specific transfer sequence?

Yes. Operating logic, time delays, source priorities and generator interfaces should be confirmed in the approved control narrative.

Send Project Requirements

Application solutions and RFQ guidance

Commercial standby-power applications   |   Critical-load distribution

Before requesting a configuration, review the SLD and BOQ preparation guide.

BOQ and RFQ are different documents

For procurement terminology and document responsibilities, read BOQ vs RFQ for electrical switchgear projects.

Configuration inputs

Provide the single-line diagram, required standard, system ratings, installation conditions and preferred component make. Our technical response will identify the proposed scope and any deviations.

Available options

Electrical scheme, enclosure construction, cable entry, protection, metering, component make, IP rating, packing and documentation are configurable to the approved project scope.

Frequently asked questions

Can this equipment be manufactured to our SLD?

Yes. The final configuration is developed from approved drawings, ratings and component schedules.

Which documents are needed for a quotation?

Send the SLD, BOQ or specification, quantity, destination country and requested delivery schedule.

Are tests and reports available?

Available routine tests and documents depend on product scope. Only confirmed reports will be included in the proposal.