MV Switchgear & Cable Distribution

GT-SRM-12 Gas insulated ring main unit

Match the switching duty, fault level and cable interfaces to your medium-voltage project.

Send drawings, a schedule or a short brief. We review the scope, identify open technical questions and discuss drawing and quotation requirements.

Discuss your project

Drawings incomplete? Tell us what you know. Attachments are optional.

GT-SRM-12 Gas insulated ring main unit

GT-SRM-12 catalogue configuration. Final components, ratings and construction follow the approved project drawings.

Rated voltage / frequency12 kV / 50 Hz
Rated current, load-break switch / fuse combination / breaker unit630 / 125 / 630 A
1 min power-frequency withstand, phase-to-phase / earth42 kV
1 min power-frequency withstand, isolating gap48 kV
Lightning impulse withstand, phase-to-phase / earth75 kV
Lightning impulse withstand, isolating gap85 kV

Source: product catalogue, page 7, 8. Ratings belong to the stated model and functional unit. Other voltages, frequencies and environmental conditions require confirmation.

View the complete model parameters
Auxiliary and control circuit withstand2 kV
Short-time withstand, load-break switch / breaker unit20 kA, 4 s
Peak withstand, load-break switch / breaker unit50 kA
Short-circuit breaking, fuse combination / breaker unit31.5 / 20 kA
Short-circuit making current50 kA
Transfer current, fuse combination1700 A
Active-load and closed-loop breaking, load-break switch / breaker unit630 A
Cable-charging breaking, load-break switch / breaker unit10 / 15 A
Mechanical endurance, load-break switch / fuse combination / breaker unit5000 / 5000 / 10000 operations
Disconnector / earthing switch endurance3000 operations
Circuit resistance, load-break switch / breaker unit≤150 μΩ
Rated gas filling pressure1.35 bar
SF6 annual leakage rate≤0.1%
ProtectionGas tank IP67; cabinet IP4X

Values are listed by functional unit; fuse performance depends on the selected fuse.

Supplier network

Selected component brands we can source

Send your approved makes and models. We work through suppliers to confirm suitable components for the project scope.

Schneider Electric
ABB
CHINT
Siemens
DELIXI Electric
Mitsubishi Electric

Models, supply routes and availability are confirmed per project. Component sourcing does not imply system certification or brand authorization.

Project documentation

Documents you can request

Request the records applicable to the proposed equipment and the company responsible for production.

Quality management illustration

ISO 9001

Quality management system

Confirm the certificate holder and validity.
Technical document illustration

Test documentation

Project-specified standard

Confirm the actual report and applicable product scope.
Inspection record illustration

Inspection records

Checks for the delivered equipment

Required records are agreed with the order.
People, supply and support

Why work with Zejiefu?

Practical sourcing, experienced people and technical support after shipment.

Low-voltage switchgear assemblies in a workshop
Low-voltage assembly reference
01 · Yueqing supply base

More options within your budget

Based in Yueqing's established electrical manufacturing cluster, we draw on a mature cabinet and component supply network to develop a cost-conscious proposal.

02 · 28 years of team experience

Make the design buildable

Our engineering and installation teams review drawings with attention to practical assembly, access and installation.

03 · After delivery

Technical help stays available

We support questions about installation, documents, troubleshooting and replacement parts after shipment.

What happens after you send the brief?

We identify missing decisions early so you can compare the proposed scope and quotation.

You send

  • SLD and functional-unit schedule
  • Voltage, current and fault level
  • Cable interfaces and site conditions
  • Protection and interlocking requirements

We check

  • Incoming and outgoing scope
  • Ratings and selection inputs
  • Layout and access constraints
  • Spare provision and open questions

We discuss next

  • Possible equipment arrangement
  • Items needing confirmation
  • Drawing and document scope
  • Quotation scope and exclusions

Initial project discussion is free. Preliminary scheme and drawing scope are discussed case by case; final construction drawings are agreed separately.

Configuration and project guidance

Review the product scope and selection notes before sending your requirements.

Application

Compact medium-voltage ring main distribution for utility, industrial and building projects. It can be adapted to industrial, commercial, utility and infrastructure power distribution projects after engineering review. The final configuration is developed from the submitted SLD, BOQ and technical specification.

Configurable scope
  • Electrical scheme and feeder arrangement based on approved drawings
  • Cabinet structure, enclosure dimensions and cable entry direction
  • Protection, metering, control and indication components
  • Factory routine inspection, packing and export delivery coordination
  • Project-specific electrical scheme, metering and protection arrangement
  • Installation layout, cable entry direction and documentation requirement
Typical RFQ information
  • Rated voltage, current and short-circuit requirement
  • Single-line diagram and functional units
  • Installation environment and enclosure requirement
  • Preferred protection, metering and switching components
  • Destination country and project schedule
Common applications
  • Industrial power distribution and production workshops
  • Commercial building electrical rooms and utility rooms
  • Infrastructure, outdoor distribution and project package supply
  • Drawing-led EPC procurement where final scope is confirmed by technical documents
Standards and documentation

GT-SRM-12 Gas insulated ring main unit can be configured for project requirements and applicable IEC or GB standards. Final compliance, test documents and drawings should be confirmed against the approved technical specification.

Common questions

Can this equipment be customized?

Yes. The configuration should follow the approved SLD, BOQ, component schedule and project standard.

Can Zejiefu quote from incomplete information?

Yes. You can send available drawings and requirements first. Missing ratings, enclosure details and component choices can be clarified during engineering review.

Is online pricing available?

No fixed online price is shown because each cabinet or box is configured according to project drawings, quantities and destination requirements.

Send your project requirements

Start with what you have. We will identify the next technical questions.

Discuss your project