Prefabricated Substations

ZGS11-12 Combined American prefabricated substation

Coordinate the transformer, switching equipment and site interfaces in one project scope.

Send drawings, a schedule or a short brief. We review the scope, identify open technical questions and discuss drawing and quotation requirements.

Discuss your project

Drawings incomplete? Tell us what you know. Attachments are optional.

ZGS11-12 Combined American prefabricated substation

ZGS11-12 catalogue configuration. Final components, ratings and construction follow the approved project drawings.

HV nominal voltage10 kV
LV nominal voltage, model designation0.4 kV
Maximum HV operating voltage12 kV
Rated frequency50 Hz
Rated capacity range50–1600 kVA
1 min power-frequency withstand35 kV

Source: product catalogue, page 18, 19. Ratings belong to the stated model and functional unit. Other voltages, frequencies and environmental conditions require confirmation.

View the complete model parameters
Lightning impulse withstand75 kV
Cooling methodOil-immersed natural cooling
HV backup fuse breaking current50 kA
Plug-in fuse breaking current25 kA
Ambient temperature−35 to +40°C
Permissible winding temperature rise65 K
Off-circuit tap range±5% or ±2 × 2.5%
Noise level50 dB
Enclosure protectionIP43
Installation altitude≤1000 m
Supplier network

Selected component brands we can source

Send your approved makes and models. We work through suppliers to confirm suitable components for the project scope.

Schneider Electric
ABB
CHINT
Siemens
DELIXI Electric
Mitsubishi Electric

Models, supply routes and availability are confirmed per project. Component sourcing does not imply system certification or brand authorization.

Project documentation

Documents you can request

Request the records applicable to the proposed equipment and the company responsible for production.

Quality management illustration

ISO 9001

Quality management system

Confirm the certificate holder and validity.
Technical document illustration

Test documentation

Project-specified standard

Confirm the actual report and applicable product scope.
Inspection record illustration

Inspection records

Checks for the delivered equipment

Required records are agreed with the order.
People, supply and support

Why work with Zejiefu?

Practical sourcing, experienced people and technical support after shipment.

Low-voltage switchgear assemblies in a workshop
Low-voltage assembly reference
01 · Yueqing supply base

More options within your budget

Based in Yueqing's established electrical manufacturing cluster, we draw on a mature cabinet and component supply network to develop a cost-conscious proposal.

02 · 28 years of team experience

Make the design buildable

Our engineering and installation teams review drawings with attention to practical assembly, access and installation.

03 · After delivery

Technical help stays available

We support questions about installation, documents, troubleshooting and replacement parts after shipment.

What happens after you send the brief?

We identify missing decisions early so you can compare the proposed scope and quotation.

You send

  • SLD and transformer requirements
  • HV and LV supply ratings
  • Site layout and access
  • Utility and project specifications

We check

  • Incoming and outgoing scope
  • Ratings and selection inputs
  • Layout and access constraints
  • Spare provision and open questions

We discuss next

  • Possible equipment arrangement
  • Items needing confirmation
  • Drawing and document scope
  • Quotation scope and exclusions

Initial project discussion is free. Preliminary scheme and drawing scope are discussed case by case; final construction drawings are agreed separately.

Configuration and project guidance

Review the product scope and selection notes before sending your requirements.

Application

Compact American-style prefabricated substation for outdoor distribution projects. It can be adapted to industrial, commercial, utility and infrastructure power distribution projects after engineering review. The final configuration is developed from the submitted SLD, BOQ and technical specification.

Configurable scope
  • Electrical scheme and feeder arrangement based on approved drawings
  • Cabinet structure, enclosure dimensions and cable entry direction
  • Protection, metering, control and indication components
  • Factory routine inspection, packing and export delivery coordination
  • Project-specific electrical scheme, metering and protection arrangement
  • Installation layout, cable entry direction and documentation requirement
Typical RFQ information
  • Package arrangement and incoming power requirements
  • Medium-voltage and low-voltage scheme
  • Outdoor enclosure layout and IP requirement
  • Metering, protection and cable entry requirements
  • Destination country and delivery schedule
Common applications
  • Industrial power distribution and production workshops
  • Commercial building electrical rooms and utility rooms
  • Infrastructure, outdoor distribution and project package supply
  • Drawing-led EPC procurement where final scope is confirmed by technical documents
Standards and documentation

ZGS11-12 Combined American prefabricated substation can be configured for project requirements and applicable IEC or GB standards. Final compliance, test documents and drawings should be confirmed against the approved technical specification.

Common questions

Can this equipment be customized?

Yes. The configuration should follow the approved SLD, BOQ, component schedule and project standard.

Can Zejiefu quote from incomplete information?

Yes. You can send available drawings and requirements first. Missing ratings, enclosure details and component choices can be clarified during engineering review.

Is online pricing available?

No fixed online price is shown because each cabinet or box is configured according to project drawings, quantities and destination requirements.

Send your project requirements

Start with what you have. We will identify the next technical questions.

Discuss your project