LV Distribution & Control

MNS Low voltage withdrawable switchgear

Coordinate the electrical duty, circuit schedule and installation space before finalizing your equipment proposal.

Send drawings, a schedule or a short brief. We review the scope, identify open technical questions and discuss drawing and quotation requirements.

Discuss your project

Drawings incomplete? Tell us what you know. Attachments are optional.

MNS Low voltage withdrawable switchgear

MNS catalogue configuration. Final components, ratings and construction follow the approved project drawings.

Overvoltage categoryIV / III
Pollution degree3
Rated operational voltage400 / 660 V AC
Rated insulation voltage660 / 1000 V
Rated frequency50 / 60 Hz
Horizontal busbar current≤5000 A

Source: product catalogue, page 32. Ratings belong to the stated model and functional unit. Other voltages, frequencies and environmental conditions require confirmation.

View the complete model parameters
Horizontal busbar short-time withstand, 1 s50 / 65 / 80 kA
Horizontal busbar peak withstand105 / 140–176 kA
Vertical busbar current≤1000 A
Vertical busbar short-time withstand50 kA
Vertical busbar peak withstand105 kA
Enclosure protectionIP30 / IP40, subject to configuration
Ambient temperature−5 to +40°C; 24 h average ≤35°C
Installation altitude≤2000 m
Supplier network

Selected component brands we can source

Send your approved makes and models. We work through suppliers to confirm suitable components for the project scope.

Schneider Electric
ABB
CHINT
Siemens
DELIXI Electric
Mitsubishi Electric

Models, supply routes and availability are confirmed per project. Component sourcing does not imply system certification or brand authorization.

Project documentation

Documents you can request

Request the records applicable to the proposed equipment and the company responsible for production.

Quality management illustration

ISO 9001

Quality management system

Confirm the certificate holder and validity.
Technical document illustration

Type-test report

IEC 61439

Confirm the actual report and applicable product scope.
Inspection record illustration

Inspection records

Checks for the delivered equipment

Required records are agreed with the order.
People, supply and support

Why work with Zejiefu?

Practical sourcing, experienced people and technical support after shipment.

Low-voltage switchgear assemblies in a workshop
Low-voltage assembly reference
01 · Yueqing supply base

More options within your budget

Based in Yueqing's established electrical manufacturing cluster, we draw on a mature cabinet and component supply network to develop a cost-conscious proposal.

02 · 28 years of team experience

Make the design buildable

Our engineering and installation teams review drawings with attention to practical assembly, access and installation.

03 · After delivery

Technical help stays available

We support questions about installation, documents, troubleshooting and replacement parts after shipment.

What happens after you send the brief?

We identify missing decisions early so you can compare the proposed scope and quotation.

You send

  • SLD or circuit schedule
  • Supply ratings and fault level
  • Installation space and cable entry
  • Approved component list

We check

  • Incoming and outgoing scope
  • Ratings and selection inputs
  • Layout and access constraints
  • Spare provision and open questions

We discuss next

  • Possible equipment arrangement
  • Items needing confirmation
  • Drawing and document scope
  • Quotation scope and exclusions

Initial project discussion is free. Preliminary scheme and drawing scope are discussed case by case; final construction drawings are agreed separately.

Configuration and project guidance

Review the product scope and selection notes before sending your requirements.

Application

Withdrawable low-voltage switchgear for main distribution and motor control applications. It is commonly considered for main distribution rooms, motor control feeders and projects that need withdrawable functional units for maintenance access. The final configuration is developed from the submitted SLD, BOQ and technical specification.

Configurable scope
  • Electrical scheme and feeder arrangement based on approved drawings
  • Cabinet structure, enclosure dimensions and cable entry direction
  • Protection, metering, control and indication components
  • Factory routine inspection, packing and export delivery coordination
  • Withdrawable feeder units, MCC feeders or main distribution sections
  • Busbar system, compartment arrangement and interlocking requirements
Typical RFQ information
  • System voltage and rated current
  • Short-circuit capacity and IP rating
  • Incoming and outgoing feeder arrangement
  • Preferred component brand and quantity
  • Destination country and project schedule
Common applications
  • Industrial power distribution and production workshops
  • Commercial building electrical rooms and utility rooms
  • Infrastructure, outdoor distribution and project package supply
  • Drawing-led EPC procurement where final scope is confirmed by technical documents
Standards and documentation

MNS Low voltage withdrawable switchgear can be configured for project requirements and applicable IEC or GB standards. Final compliance, test documents and drawings should be confirmed against the approved technical specification.

Common questions

When is MNS switchgear usually selected?

MNS is usually selected when a project needs withdrawable low-voltage feeders, maintainable functional units and a clear feeder schedule.

Can Zejiefu quote from incomplete information?

Yes. You can send available drawings and requirements first. Missing ratings, enclosure details and component choices can be clarified during engineering review.

Is online pricing available?

No fixed online price is shown because each cabinet or box is configured according to project drawings, quantities and destination requirements.

Send your project requirements

Start with what you have. We will identify the next technical questions.

Discuss your project