A capacitor bank wiring diagram shows how one current signal decides which capacitor steps switch on. This guide explains how to read that drawing for a three-phase low-voltage (LV) automatic power factor correction (APFC) panel: the current transformer (CT), the controller, the step outputs and each capacitor branch.
It does not cover medium-voltage or pole-mounted utility banks, or capacitors fitted directly to individual motors. Those use different connections and protection.
This is a guide to reading drawings, not live-wiring instructions. Terminal numbers and phase assignments differ between controller models. Always confirm them in the manual supplied with your controller, and have a qualified engineer review the final drawing.
How the parts work together
Every APFC drawing describes one loop: the CT measures current, the controller decides, and each output switches one capacitor step. Read the drawing in that order.
Tap or click the diagram to open it full size.Figure 1. How the CT signal reaches the capacitor steps.
The CT on the main incomer measures the current of the loads and the capacitors together. The controller combines it with a measured voltage, calculates the power factor and switches steps in or out until it reaches the target.
The four drawings you may receive
A complete drawing set for an APFC panel usually has four kinds of drawing. Each one answers different questions, so know which one you are holding before you start checking it.
| Drawing | What it shows | Questions it answers |
|---|---|---|
| Single-line diagram (SLD) | The panel’s connection point on the main switchboard, the incomer, the CT position and the step ratings | Is the bank connected where planned? Is the CT upstream of both the loads and the bank? What are the total kvar and the step sizes? |
| Power circuit (three-line) diagram | Busbars, step protection, switching devices, reactors, capacitors and discharge devices | What protects each step? Contactor or thyristor switching? Detuned or not? |
| Control circuit diagram | Controller voltage and current inputs, control supply, relay common and outputs, contactor coils, fans, thermostats, alarms and interlocks | Which phases feed the controller? What voltage are the coils? What blocks the bank (door, generator, over-temperature)? |
| Terminal diagram | Terminal and wire numbers on the controller and terminal strips | Which wire lands on which terminal during installation and maintenance? |
A general arrangement (GA) drawing shows the physical layout rather than the circuits. Some authorities ask for it at design approval, as the UAE and Saudi section below explains.
Reading the drawing, element by element
1. The CT: check its location first
The controller can only correct what its CT measures. The CT must carry the total current of the loads being compensated plus the bank’s own current, so it sits upstream of both. In most installations that means the main incomer of the LV switchboard, not the capacitor panel itself. Manufacturer documents state this consistently, for example Schneider Electric’s LV automatic bank data, the GE detuned bank instructions and the TDK BR6000 controller manual.
On the SLD, trace the CT to the point where the capacitor panel connects. If the panel connects upstream of the CT, the controller never sees the capacitor current.
- Two transformers with a bus coupler need special care. One CT cannot see the whole load once the coupler closes, so designs use a summation CT (Lauritz Knudsen).
- The CT ratio on the drawing must match the ratio programmed in the controller. Secondary current is normally 1 A or 5 A.
- A CT secondary must never be opened while primary current flows. Drawings often show a shorting link or test terminal. Manuals say to short the CT before removing the controller and to remove any factory shorting link at commissioning (Eaton BLR-ACX, TCI PF Guard).
2. Phase pairing: single-CT or three-CT controller?
Find out how many currents the controller measures before you check phases. The rules differ.
A single-CT controller measures one current and one voltage, then calculates the phase angle from an assumed pairing. A common arrangement is voltage across two phases with the CT on the third. Schneider’s panel builder guide pairs L2–L3 voltage with an L1 CT (PB Guide 2015); the CHINT NWK1-G pairs B–C voltage with an A-phase CT. Other models measure line-to-neutral voltage with the CT on the same phase.
The chosen CT phase is not universal either. Legrand places the CT on L1 for Alpimatic banks and on L3 for Alpistatic banks (Legrand AlpesTech). Many controllers can detect the connection automatically or accept a phase-angle setting. A wrong pairing can still produce a plausible but wrong power factor.
A three-CT controller pairs each current with its own phase voltage, as in the 3-phase 4-wire mode of the Siemens 7UG0.
Polarity matters in both cases. The drawing should show the CT’s primary marking (P1, K or H) facing the supply, with S1 and S2 landing on the matching controller terminals. Some controllers correct reversed polarity automatically; others raise an alarm.
3. Controller voltage input and supply
Voltage measurement wires are taken from the busbar through small fuses. The NWK1-G drawing shows 1 A fuses; use the values in your own manual. The controller’s own supply may come from the measuring voltage internally, as on the NWK1-G, or from a separate 220 V terminal, as on the newer NWK1-GR (CHINT NWK1-GR catalogue). Check that the rated measuring voltage and frequency match the site; Saudi networks run at 60 Hz.
4. Outputs, the relay common and contactor coils
Relay outputs share one common terminal (COM), fed from one phase through a fuse. Each output energises one contactor coil. The other end of the coil returns to neutral for a 220/230 V coil, or to another phase for a 380/400 V coil. The drawing must state which. Some manufacturers add conditions: the BR6000 manual asks for the coil supply to be taken from the same phase as the measuring voltage.
Controllers for thyristor-switched banks use transistor or DC signal outputs instead of relay contacts.
5. One step branch
Each step on the power circuit diagram normally reads, from the busbar down:
- Protection: fuses, an MCB or an MCCB
- Switching device: a capacitor-duty contactor with pre-charge resistors, or a thyristor switch
- Optional detuning reactor, with its thermal switch wired into the control circuit
- Capacitor, usually delta-connected, with a discharge device

Figure 2. Inside a five-step APFC panel without reactors. Each vertical column is one step: protection, contactor, capacitor. The main CT is normally on the switchboard incomer, so it does not appear in this photo.
Check the protection rating against the capacitor current. Schneider’s guide sets the protection as a multiple of rated capacitor current, with lower multiples for detuned steps (5.7%, 7% and 14%) than for standard ones (Schneider Electrical Installation Guide). Step sizes are covered in our guide to sizing an APFC capacitor bank.
Whether a step needs a detuning reactor, and how to choose its tuning, is explained in when an APFC panel needs detuned reactors.
6. Discharge and reconnection delay
A capacitor must discharge before it is switched back on. IEC-based guidance requires discharge to 75 V within 3 minutes; Saudi Electricity Company specification 43-SDMS-03 asks for below 50 V within 60 seconds (SEC). The controller’s reconnection delay must suit the actual discharge time. The NWK1-G switching delay is adjustable from 5 to 180 seconds.
7. Temperature, fans, alarms and interlocks
Look for reactor thermal switches, a cabinet thermostat and fan circuit, the alarm relay output and any door interlock on the incomer. These usually appear only on the control circuit diagram, so they are easy to miss.
8. Generator operation
Many banks provide a contact that blocks the controller while the site runs on a generator. Schneider lists this generator contact as a standard feature of its LV automatic banks. If the site has standby generation, find where that signal enters the control circuit.
The control and interlock checks for this case are covered in capacitor banks on generator power.
A worked example: the CHINT NWK1-G controller
The CHINT NWK1-G is a single-CT controller: it measures the B–C line voltage and the A-phase current. Its terminal names changed between drawing editions, so older and newer drawings for the same controller can look different.
| Function | Earlier marking | Current marking | What the drawing shows |
|---|---|---|---|
| Voltage measurement | L2, L3 | Ub, Uc | Phases B and C, each through a fuse (1 A on the earlier drawing) |
| Current measurement | S1, S2 | Ia, In | CT on phase A, upstream of the capacitor branches and the load; S2 earthed on the relay-output drawing |
| Relay common | COM | COM | Fed from one phase through a fuse (5 A on the earlier drawing) |
| Step outputs | 1–10 | J1–J10 | One output per contactor coil |
| Coil return (point P) | N | N, or phase B for 380 V coils | CHINT recommends 220 V coils |
The CHINT sample states that the controller identifies the phase and polarity of the B–C voltage and A-phase current automatically. Do not assume the same of other controllers.
Both drawings place the CT at the transformer’s LV output, before the point where the capacitor branches and the outgoing load feeders split. That is the location rule from the previous section, shown on a real product drawing. The figures below are redrawn in English from CHINT’s drawings; fuse ratings and CT earthing are as shown there, not general recommendations.
Tap or click the diagram to open it full size.Figure 3. NWK1-G-10 with relay outputs (current terminal marking), redrawn in English from CHINT’s manual, figure 5.2.
Tap or click the diagram to open it full size.Figure 4. NWK1-G with the earlier terminal marking (L2, L3, S1, S2), redrawn in English from a CHINT drawing.
When readings look wrong: where to look first
Several common controller symptoms trace back to a specific place on the drawing. The table lists only links that a controller manual or a recorded case states.
| Symptom | Check first on the drawing | Reported in |
|---|---|---|
| Power factor barely changes when steps switch in | CT location: downstream of the capacitor connection, or on one feeder only | Eaton BLR-ACX; CHINT JKF8 manual |
| Power factor gets worse as steps switch in | CT polarity reversed (S1/S2 or P1/P2) | Eaton BLR-ACX |
| Negative cos φ displayed | CT polarity or the CT–voltage phase pairing | CHINT NWK1-G installation note |
| No power factor shown after power-up | CT phase, or the phase sequence of the two voltage inputs | Schneider PB Guide 2015 |
| Capacitive power factor at light load with no steps on | May be genuine; force one step and check that kvar changes by about one step size | Schneider Electric community |
Isolate the panel and short the CT secondary before touching any measurement wiring.
For routine inspection and records once the panel is in service, use our capacitor bank maintenance checklist.
Projects in the UAE and Saudi Arabia: local checks
Local utility documents add requirements that should be visible on the drawings. Confirm the current edition with the authority before relying on any of them.
| Authority | Document | What to look for on the drawings |
|---|---|---|
| DEWA, Dubai | Regulations for Electrical Installations, 2017 edition, section 8.1 | Automatic discharge with a permanently connected discharge circuit; incomer interlocked with the door; forced ventilation that trips and alarms on failure; series reactors chosen from a network study rather than a fixed percentage |
| DEWA, Dubai | Circular HCS/91/2001, “Safety of Capacitor Bank Installation”, 16 January 2001 | Design submission with standards, capacitor data including the discharge device, contactor details, a general arrangement drawing, and an extract fan controlled by a thermostat set at 30 °C |
| SEC, Saudi Arabia | 43-SDMS-03 (2009) | 380 V, 60 Hz ratings; discharge below 50 V within 60 seconds; detuning options of 5.67%, 7% and 14% |
| ADDC, Abu Dhabi | LV capacitor panel prequalification annexures | Type-tested panel groups at 440 V; certificates for the controller, reactors, MCCB and contactors |
The DEWA circular dates from 2001 and may have been superseded in part by the 2017 Regulations.
Drawings to request before you order
Ask the panel supplier for the following with the quotation or at drawing approval, so they can be checked before the panel is built.
- Single-line diagram showing the connection point, the CT position and the CT ratio
- Power circuit diagram for every step, with protection, switching device, reactor and capacitor ratings
- Control circuit diagram showing coil voltage, the relay common supply, interlocks, fans and alarms
- Terminal diagram for the controller and the terminal strips
- General arrangement and internal layout drawing
- Controller model and the manual edition the drawing follows
- Capacitor discharge time and the controller’s reconnection delay setting
For the wider list of decisions before ordering, see our APFC panel selection guide. To discuss a drawing set or a new panel, see our APFC capacitor bank panels, or send your single-line diagram and panel requirements.